Project included: New piping, valves, electrical, and instrumentation work to revitalize the blowdown piping system.
Owner | Parker Water and Sanitation District |
---|---|
Engineer | Dewberry |
Value | $150,000.00 |
Contract Duration | 54 Days |
Project included: New piping, valves, electrical, and instrumentation work to revitalize the blowdown piping system.
Owner | Parker Water and Sanitation District |
---|---|
Engineer | Dewberry |
Value | $150,000.00 |
Contract Duration | 54 Days |